We continue on with the backfilling process and water.

We continue on with the backfilling process and water.

The finishing of the pool and spa decking.

The finishing of the pool and spa decking.

2:30 pm we finish installing the skimmer on the pool.

pm we finish installing the skimmer on the pool.

Some final touches on the pool before we grade the yard.

Some final touches on the pool before we grade the yard.

Moving right along with the cantilever coping.

Moving right along with the cantilever coping.

10:30 am form work going as planned.  Elegant style.

am form work going as planned.

Image result for drop in fiberglass pool forms

Setting up the Cantilever forms on the Pool.

1:45 pm the water is going into the pool!

pm the water is going into the pool!

8:45 am April 16th setting the cantilever forms on the spa.

am April setting the cantilever forms on the spa.

The first 6,000 gallons of H2O is being pumped in.

The first gallons of is being pumped in.

12 Noon grading off the yard.  Just about ready for electricians.

12 Noon grading off the yard. Just about ready for electricians.

The pool and spa concrete decking is complete.

The pool and spa concrete decking is complete.

Installing expansion Joints in this soon to be brushed deck.

Installing expansion Joints in this soon to be brushed deck.

11:00 am we are finishing the Spa cantilever.

am we are finishing the Spa cantilever.

Just about ready for water!  Maybe one lift up to adjust grading.

Maybe one lift up to adjust grading.

The installation of the decking is going smooth.

The installation of the decking is going smooth.